RESOURCE CENTRE

SEARCH FOR RESOURCES (Total number: 1211)

RESOURCES SEARCH RESULTS ( 1 - 1 from 1 )

EU GPP case study: Powering Bremen with renewable electricity
A public tender was published at the EU level by the City of Bremen to cover the electricity requirements for a number of local public entities, including Bremerhaven Municipality, from renewable energy sources. The contract is for the supply of 79 million kilowatt hours annually, with a total approximate cost of 7.5 million euro per annum.
English
Germany
Energy
European Commission - Directorate General Environment
2011