SPP Regions tender model: Facilitation of energy saving habits in municipal facilities
Granollers City Council call for tender aims to procure a service contract for technical support in regards to the development of an energy strategy for municipal facilities.
SPP Regions tender model: Installation of biomass boiler using local fuel in Dosrius
The Catalan municipality of Dosrius awarded a contract in 2016 for the installation and maintenance of a biomass boiler and heat network for a school and sports facility.
SPP Regions tender model: Energy neutral primary school in Lansingerland
The contract awarded by the municipality of Lansingerland in the Netherlands in July 2017 aimed at building an energy-neutral school building. The preparation and tendering of construction and maintenance contract will be completed in 2018.
SPP Regions tender model: Energy renovation of technical installations in Egedal municipality
With this tender, Egedal Municipality has chosen to designate a consultant to schedule and manage the work on the 71 energy renovations; including design of sub-projects, implementation of main contract and consultancy in the execution phase.
SPP Regions tender model: Installation of a Heat Network in Bristol
Bristol City Council developed a district heat network linking two small networks, including the installation of a biomass boiler and efficient gas boilers.
SPP Regions tender model: Procurement of Dutch green electricity in Lansingerland
The Municipality of Lansingerland in the Netherlands awarded a 2 year contract in 2017 for the supply of 100% green electricity, deriving solely from Dutch wind, solar and biomass sources.
Bristol City Council procured a new active wood drying system solution to improve biomass boiler efficiency linked to authority's plant nursery operation.
SPP Regions tender model: Electricity with additionality in Lorient
The City of Lorient has conducted the procurement of renewable electricity with high environmental value (HVE), as part of its certification under the European Energy Award. The tender covered an indicative consumption of 914 Mwh/year, representing about 7% of Lorient's total estimated electricity consumption.