RESOURCE CENTRE

SEARCH FOR RESOURCES (Total number: 1211)

RESOURCES SEARCH RESULTS ( 253 - 261 from 392 )

Measuring carbon dioxide emissions in Turin
This case study reports the example of Turin's procurement of school catering. To gain a better understand of what levels of greenhouse gas emissions were produced at different stags of the food procurement, a detailed study was commissioned from the University of Turin to look into the carbon footprint of the catering system in more depth.
English
Italy
Food and catering
INNOCAT Consortium
2016
Almere Upcycle City Competition
The aim of the competition, which takes the form of a tender, is to stimulate economic activity and allow for the realisation of innovative plans, which are focused on making products using the city's waste flows.
English
Netherlands
Waste
Almere City Council
2017
GPP 2020 Tender Model: Purchase of vehicles
This GPP 2020 Tender Model refers to the procurement of energy efficient vehicles by Zagreb Holding resulting in an improvement of environment protection and of the company's social responsible profile
English
Croatia
Transport and vehicles
Energy efficiency
GPP 2020 Consortium
2016
GPP 2020 Tender Model: Acquisition of paper reams
This case study focuses on the adoption of Minimal Environmental Criteria developed by the Italian Ministry of the Environment and for Protection of the Land and Sea for the acquisition of copy paper
English
Europe/EU, Italy
Ecolabels
GPP 2020 Consortium
2016
GPP 2020 Tender Model: Renovation of the ex INPS building
This GPP 2020 Tender model considers the design and management services for the regeneration works of the ex_INPS building located in Genoa
English
Italy
Buildings and construction
Energy efficiency
GPP 2020 Consortium
2016
EU GPP case study: Bulgarian Agency greens its project management
The Bulgarian Agency for Social Assistance has been piloting a more sustainable approach to managing projects. In 2011, it awarded a number of contracts which applied GPP criteria for the supply of printed material, paper and office supplies, as well as logistics in organising and conducting seminars. The criteria included requirements on the use of recycled plastics and paper and the provision of organic food and drink products during meetings. With good results emerging from the pilot, the ASA is making a broader commitment to implement GPP in its activities. It is also acting as an ambassador for other agencies and departments wishing to apply similar practices. The result is helping to achieve the targets set out in Bulgaria’s National Action Plan for 2012-2014.
English
Bulgaria
Food and catering, Office stationery, Events
European Commission - Directorate General Environment
2012
Market Consultation Report: Brouwersdam tidal power plat
This report includes a detailed account on the market consultation about the realization of the Brouwersdam tidal plant in the Netherlands
English
Netherlands
Buildings and construction
Getijdencentrale Brouwersdam
GPP 2020 Tender Model: Service for the management of the printing system
This GPP 2020 case study looks at the rental of multifunctional printing devices which aim at consumption reduction and at an improved equipment management
English
Europe/EU, Italy
Energy efficiency
GPP 2020 Consortium
2016
GPP 2020 Tender Model: Reconstruction Motorway A6 Almere
Rijkswaterstaat developed a methodology for infrastructure projects whereby the functional specification of the tender together with the quality input from the client ensure an innovative and high-quality solution
English
Europe/EU, Netherlands
Infrastructure
Energy efficiency
GPP 2020 Consortium
2016